Donlin Gold

Property Details


Interpreted mineral system (using mineral system classification of Hofstra and Kreiner, 2020*)

Activity by Year


Year Activity Status Operator Project Name Description
2015 Exploration Development Project Donlin Gold LLC The Donlin Gold project, 270 miles west of Anchorage, is the major development project in the state. NovaGold reported 2015 expenditures of $11 million toward its share of the joint venture, and anticipates expenditures exceeding $9 million in 2016.
2016 Exploration Development Project Donlin Gold LLC As part of its mine-development effort, in 2016 Donlin Gold applied to install a number of structures and facilities on State lands and also requested to restrict public easements. In its 2016 year-end financial report and project update, NOVAGOLD listed major milestones that include advancement of the permitting and technical work at the project.
2017 Exploration Development Project Donlin Gold LLC The total exploration and development budget for the Donlin Gold project for 2017 was $21.7 million. NovaGold and Barrick made significant progress on major State permits and approvals for permitting the Donlin Gold project in 2017.
2017 Exploration Development Project Novagold, Barrick; Donlin Gold LLC In June 2017, Donlin Gold, LLC approved an $8 million drill program budget. The program included 16 holes for a total of 23,097 feet, and reported highlights include: mineralized intercepts encountered higher grades than predicted by previous modeling; distinct, significant, high-grade zones were intercepted in multiple areas; and high-grade mineralization was intercepted at depth in the ACMA deposit in an area of sparse drilling.
2018 Exploration Development Project Novagold, Barrick; Donlin Gold LLC The total advanced-stage exploration and development budget for the Donlin Gold project for 2018 was $22 million. The total advanced-stage exploration and development budget for the Donlin Gold project for 2018 was $22 million.
2019 Exploration Exploration Project Novagold, Barrick; Donlin Gold LLC The project continued to move through the permitting process in 2019, at years-end securing permits and easements for the access road, fiber optic cable, and buried natural gas pipeline through Rainy Pass. In mid-2019, the partners commenced a multi-year, on-site geotechnical program to upgrade the engineering of the tailings facility to the detailed level of design required for the project?s dam safety permits.

Production Stats


Year Total Rock Mined (short tons) Waste Rock (short tons) Ore Mined (short tons) Ore Milled (short tons) Heap Leach Ore (short tons) Total Concentrate Produced (short tons) Pb Ore Grade % Pb Recovered (short tons) Zn Ore Grade % Zn Recovered (short tons) Au Head/Ore Grade (OPT) Au Recovered (troy ounces) Au Recovery % Ag Ore Grade (OPT) Ag Recovered (million troy ounces) Coal (short tons) Other Other Amount Other Units

Resources


Source Year Description Property Phase Category Resource (short tons) Cu % Cu (thousand pounds) Pb % Pb (thousand pounds) Zn % Zn (thousand pounds) Au (OPT) Au (thousand oz) Ag (OPT) Ag (thousand oz) Mo % Mo (thousand pounds) Co % Co (thousand pounds) Barite % Barite (thousand pounds) TREO % TREO (thousand pounds) Graphite % Graphite (thousand pounds)
NovaGold Resources, Inc. Donlin Creek Gold Project, Alaska, USA, NI 43-101 Technical Report on Second Updated Feasibility Study; dated November 18, 2011, amended January 20, 2012 2012 Development Proven 8468970.9 0.067744 0.0
NovaGold Resources, Inc. Donlin Creek Gold Project, Alaska, USA, NI 43-101 Technical Report on Second Updated Feasibility Study; dated November 18, 2011, amended January 20, 2012 2012 Development Probable 5.479841944E8 0.060736 33276.0
NovaGold Resources, Inc. Donlin Creek Gold Project, Alaska, USA, NI 43-101 Technical Report on Second Updated Feasibility Study; dated November 18, 2011, amended January 20, 2012 2012 Subtracted P&P from M&I tonnnes Development Measured 52910.4 0.073584 53.0
NovaGold Resources, Inc. Donlin Creek Gold Project, Alaska, USA, NI 43-101 Technical Report on Second Updated Feasibility Study; dated November 18, 2011, amended January 20, 2012 2012 Development Indicated 4.02108017E7 0.065408 5104.0
NovaGold Resources, Inc. Donlin Creek Gold Project, Alaska, USA, NI 43-101 Technical Report on Second Updated Feasibility Study; dated November 18, 2011, amended January 20, 2012 2012 Development Inferred 1.016496968E8 0.058984 5993.0
NovaGold Resources, Inc. Donlin Creek Gold Project, Alaska, USA, NI 43-101 Technical Report on Second Updated Feasibility Study; dated November 18, 2011, amended January 20, 2012 2012 Total 6.983665742E8 0.060836 45000.0

* Hofstra, A.H., and Kreiner, D.C., 2020, Systems-Deposits-Commodities-Critical Minerals Table for the Earth Mapping Resources Initiative: U.S. Geological Survey Open-File Report 2020-1042, 24 p., https://doi.org/10.3133/ofr20201042